{"id":461,"date":"2025-04-17T18:33:56","date_gmt":"2025-04-18T02:33:56","guid":{"rendered":"https:\/\/mvcca.ca\/?page_id=461"},"modified":"2026-03-10T09:48:58","modified_gmt":"2026-03-10T17:48:58","slug":"cloverdale-and-oak","status":"publish","type":"page","link":"https:\/\/mvcca.ca\/?page_id=461","title":{"rendered":"Cloverdale and Oak project"},"content":{"rendered":"\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"714\" data-id=\"1345\" src=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-site-sm.jpg\" alt=\"\" class=\"wp-image-1345\" srcset=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-site-sm.jpg 1024w, https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-site-sm-300x209.jpg 300w, https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-site-sm-768x536.jpg 768w, https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-site-sm-624x435.jpg 624w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1344\" src=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-model-sm.jpg\" alt=\"\" class=\"wp-image-1344\" srcset=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-model-sm.jpg 1024w, https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-model-sm-300x225.jpg 300w, https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-model-sm-768x576.jpg 768w, https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/03\/Cloverdale-and-Oak-model-sm-624x468.jpg 624w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">816 Cloverdale Ave. and 3311 Oak St. &#8211; Two residential towers for 467 units with retail at grade and two levels of underground parking<\/h2>\n\n\n\n<p>NEWS &#8211; project presented to Saanich Advisory Design Panel (ADP)  4 March 2026<\/p>\n\n\n\n<p><strong>Building A &#8211; (23 storeys) contains 256 &#8211; market rental units and Building B &#8211; (21 storeys) contains 203 market condo units and a podium section with a green space on the roof. <\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-link-color wp-elements-b34efec6772b59dab9b9bec406837fc8\" style=\"color:#0b0000\">MVCCA has completed Saanich Planning&#8217;s request for our comments by12 Dec. 2025. We have sent in our support for the project and our concerns for the long term planning of the Uptown Douglas area. &#8211; <a href=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2026\/01\/Cloverdale-816-and-3311-Oak-Dec.-comments.docx\">document link<\/a> &#8211;<\/p>\n\n\n\n<p>Dec. 9th 2025 Open House <a href=\"https:\/\/www.canva.com\/design\/DAGpfyXpl3c\/87UaBBNsXsobH-QakufKmg\/edit?utm_content=DAGpfyXpl3c&amp;utm_campaign=designshare&amp;utm_medium=link2&amp;utm_source=sharebutton\">link to the PowerPoint slides from presentation.<\/a><\/p>\n\n\n\n<p class=\"has-text-color has-link-color wp-elements-c4f24e31d3c6b5bad63e63ee0d87df35\" style=\"color:#080000\">Project Overview (as provided by the developer Nov. 24, 2025)<\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-bf061cafe587c8ebe23ae7ec80fcd959\"><strong>Location:<\/strong>&nbsp;816 Cloverdale Ave. &amp; 3311 Oak St., Uptown Core (Uptown Douglas Plan area)      <strong>Building A (Blanshard-facing):<\/strong>&nbsp;24 storeys   <strong>Building B (Oak Street-facing):<\/strong>&nbsp;21 storeys   <strong>Site Coverage:<\/strong>&nbsp;50%<\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-cd8d0a87b318f6c53d0d2cdffec08b58\">Housing Mix \u2013 A Range of Homes for All                                                        <strong>Studio Units:<\/strong>&nbsp;40 (9%)  <strong>Junior 1-Bedroom:<\/strong>&nbsp;168 (37%)  <strong>1-Bedroom:<\/strong>&nbsp;109 (24%)   <strong>2-Bedroom:<\/strong>&nbsp;91 (20%   <strong>3-Bedroom:<\/strong>&nbsp;51 (11%)<\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-c7f23c826caa9e828059671a33cd1113\"><strong>Purpose-built rental and family-oriented housing exceed District requirements<\/strong><\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-d5f9d1e55dfa2547be8fcb16bf891f49\">Community Benefits &amp; Amenities \u2013 Over $3 Million in Public Value   <strong>Community Amenity Space:<\/strong>&nbsp;4,800 sq. ft. on-site  <strong>Neighbourhood Institutional Space:<\/strong>&nbsp;Below-market lease (10-year value: <strong>$680,000<\/strong>) for non-profit, childcare, or community services   <strong>Public Plaza at Blanshard &amp; Cloverdale:<\/strong>&nbsp;High-quality pedestrian space with seating and hardscaping (<strong>$74,000<\/strong>)  <strong>Coast Salish Public Art:<\/strong>&nbsp;Significant installation in collaboration with Songhees and Esquimalt Nations (<strong>$150,000<\/strong>)   <strong>Affordable Housing Fund Contribution:<\/strong>&nbsp;Direct cash contribution (<strong>$100,000<\/strong>)   <strong>Regional Storm Infrastructure Upgrade:<\/strong>&nbsp;Full replacement west of property line (<strong>$2,085,000<\/strong>) <\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-2139966529eec85cf0b2a811980798ab\"><strong>Total Community Amenity Package Value:<\/strong> <strong>$3,089,000+<\/strong>&nbsp;(exceeds District minimum requirement by over <strong>$2.5 million<\/strong>)<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-9d81c44705a6dc546695d93734b24df1\">Commercial &amp; Streetscape Activation                                                              <strong>Commercial Space:<\/strong>&nbsp;10,400 sq. ft. of ground-floor retail\/commercial units   <strong>Enhanced Oak Street frontage<\/strong>&nbsp;with extended active commercial uses  <strong>Pedestrian-friendly design<\/strong>&nbsp;with accessible pathways (minimum 1.5m width)  <strong>Reduced surface parking<\/strong>&nbsp;to prioritize public realm and active uses<\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-70c0b8b9104cdc23ebe0f043b267a913\">Parking &amp; Transportation \u2013 Supporting Active &amp; Sustainable Mobility   <strong>Vehicle Parking:<\/strong>&nbsp;262 stalls (primarily underground to maximize public space)   <strong>Bike Parking:<\/strong>&nbsp;645 secure bike stalls across multiple rooms  <strong>Accessible parking, loading spaces, and car-share vehicle<\/strong>&nbsp;prioritized at surface level.   <strong>Transportation Demand Management (TDM) measures<\/strong>&nbsp;align with District&#8217;s evolving parking policies.  <strong>Direct pedestrian and cycling connections<\/strong>&nbsp;through the site<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-77a5cf402057e51a87448801b089a9fe\">Alignment with District Vision<\/p>\n\n\n\n<p class=\"has-blue-color has-text-color has-link-color wp-elements-41419660dcafdfaffc2c2e76cb84c3bc\">Supports <strong>Uptown Douglas Plan &#8220;Big Moves&#8221;<\/strong>: people-first public realm, vibrant mixed-use hub, diverse housing.  Delivers a <strong>landmark gateway<\/strong>&nbsp;at Blanshard &amp; Cloverdale with public plaza and cultural art.  Provides <strong>long-term community infrastructure<\/strong>&nbsp;(institutional space, storm upgrades). <strong>Exceeds <strong>family-oriented housing targets<\/strong>&nbsp;and contributes to <strong>affordable housing goals<\/strong><\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-text-color has-link-color wp-elements-5742dc285a8b9acf718984ae507c4e42\" style=\"color:#050000\">HIstory of Project information and Early Comments<\/p>\n\n\n\n<p>Notes on Sept 8<sup>th<\/sup>, 2025&nbsp; update<strong> <\/strong>&nbsp;&nbsp;&nbsp;&nbsp; The only major change is to the commercial space proposal for Tower A (which fronts onto Blanchard St and has a northern section that is three stories in height.) The new proposal is two separate parts at ground level with a breeze way between the parts.&nbsp; The south section to remain commercial space and the north section to be a single space approx. 5000 sq. ft. in size. Space to be designated &#8216;institutional&#8217; for community \/ public benefit uses.&nbsp; The space could be finished to the specifications needed after the tenant arrangement is made.&nbsp; Possibilities for tenants include non-profit run child care, Saanich facility, private sports use facility, etc. The use is somewhat limited by the parking space that can be made available.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>General comments<\/strong> 2025<\/p>\n\n\n\n<p>Original project package information received on April 2025, from Saanich Planning.  MVCCA submitted our initial comments in May 2025.<\/p>\n\n\n\n<p>10 Dec. 2024 &#8211; Zoom meeting with representatives from QCHCA, MVCCA and the developer, initial design provided. Then:  8 Sept 2025 &#8211; second Zoom call to explain design changes.&nbsp; On both occasions, the community association representatives stressed the need for the developer to set up  public Open House meetings.&nbsp; There is no mechanism in place to secure meaningful consultation with residents; for these large high-rise projects in the Saanich Core.<\/p>\n\n\n\n<p>This will be the second major project to have frontage on Oak Street. As with the 760 Tolmie Ave. towers, the owners plan for extensive resident&#8217;s amenities, not accessible by the public. Our concern is with the cumulative effect of rental housing projects on neighbourhood resources, because currently <strong>rental units are not subject to community amenity contributions (CACs)<\/strong>. Developers pay a fee for the new or expanded infrastructure needs (such as water and sewage) but this does not include amenities that are: &#8216;improvements to the public realm near the development site&#8217;.<\/p>\n\n\n\n<p>In the case of this project, building B, (market condo tower) will be subject to CACs but building A (256 rental units) will not. The Saanich policy can be found at: Community Amenity Contributions and Inclusionary Housing Policy &#8212; <a href=\"https:\/\/www.saanich.ca\/EN\/main\/community\/community-planning\/community-amenity-contributions.html\" data-type=\"link\" data-id=\"https:\/\/www.saanich.ca\/EN\/main\/community\/community-planning\/community-amenity-contributions.html\"> link<\/a>. &#8212;<\/p>\n\n\n\n<p class=\"has-text-color has-link-color wp-elements-0a62c6a7faacc1279555880d2e0966bd\" style=\"color:#040000\"><strong>MVCCA would like all of this project&#8217;s amenity contribution (via the condo units) to be applied in the immediate area<\/strong> <strong>or held for future use, in the immediate area.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"827\" height=\"602\" src=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/11\/cloverdale-oak-site.png\" alt=\"\" class=\"wp-image-1110\" srcset=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/11\/cloverdale-oak-site.png 827w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/11\/cloverdale-oak-site-300x218.png 300w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/11\/cloverdale-oak-site-768x559.png 768w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/11\/cloverdale-oak-site-624x454.png 624w\" sizes=\"auto, (max-width: 827px) 100vw, 827px\" \/><figcaption class=\"wp-element-caption\">Ground level view, with Cloverdale Ave at bottom of drawing &#8211; note building A has a passage way at ground level, access to Blanshard. Parkade access is under Building B  &#8211; image is part of Referral package dated Nov. 13<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"888\" src=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm-1024x888.jpg\" alt=\"\" class=\"wp-image-584\" srcset=\"https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm-1024x888.jpg 1024w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm-300x260.jpg 300w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm-768x666.jpg 768w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm-1536x1332.jpg 1536w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm-624x541.jpg 624w, https:\/\/mvcca.ca\/wp-content\/uploads\/2025\/05\/Cloverdale-and-Oak-design-sm.jpg 1944w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>image from information package sent to MVCCA by Saanich Planning &#8211; 8 April 2025<\/strong> . The image shows the project as seen from Cloverdale Ave. except that Buildling B would be behind an existing one level building, which is not owned by the developer and is not shown in the drawing.<\/figcaption><\/figure>\n\n\n\n<div style=\"height:8px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-post-date__modified-date wp-block-post-date\"><time datetime=\"2026-03-10T09:48:58-08:00\">March 10, 2026<\/time><\/div>","protected":false},"excerpt":{"rendered":"<p>816 Cloverdale Ave. and 3311 Oak St. &#8211; Two residential towers for 467 units with retail at grade and two levels of underground parking NEWS &#8211; project presented to Saanich Advisory Design Panel (ADP) 4 March 2026 Building A &#8211; (23 storeys) contains 256 &#8211; market rental units and Building B &#8211; (21 storeys) contains [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":72,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/full-width.php","meta":{"footnotes":""},"class_list":["post-461","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/pages\/461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mvcca.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=461"}],"version-history":[{"count":42,"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/pages\/461\/revisions"}],"predecessor-version":[{"id":1352,"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/pages\/461\/revisions\/1352"}],"up":[{"embeddable":true,"href":"https:\/\/mvcca.ca\/index.php?rest_route=\/wp\/v2\/pages\/72"}],"wp:attachment":[{"href":"https:\/\/mvcca.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}